As you might have read through our tickets and/or statuspage (https://status.belnet.be), we suffered a severe power outage this morning in our PoP at Liege Campus (LIECAM). While the power was restored quite quickly, our infrastructure remained with a hardware issue due to anomalies in the power delivery (sudden cut/spike). We have been working with our hardware vendor and integrator to solve this during the day, but after two physical interventions and several replacements, the situation is not yet fully restored. Therefore, we are forced to proceed to do a full chassis reboot, for which you might see some alerts and a small downtime (<15 minutes) for non-redundant connections. We will do the reboot now as our fieldteam has arrived on site. We apologize for the inconvenience this might cause.